Chris-Hill Project Photo Gallery Click each picture for project descriptions and picture enlargement.
Capleville Sewer Lift Station
American 7250 Friction Crane
McLemore Bridge Over CN RR
Thousand Oaks Bridge Over Nonconnah Creek
20,000 Square feet of Versa-lock retaining wall.
Jackson Avenue Viaduct over Cypress Creek in Memphis, TN
60' X 20' x 25' Sheet Pile Cofferdam with 3 steel rings. 7 Total Photos
A Linkbelt LS-118 rigged for a 70' auger-cast piling.
NBA Arena - 800' X 35' tall soldier pile with wood lagging. 21 Total Photos
An American 599 drives 45 foot PZ-27 sheet piles.
A Chris-Hill Crawler Pre-Drilling H-Piles
Target house
16 foot soldier pile and wood lagging wall.
Vibro-Prober compacts sand at a Lowe's job site.
Chris-Hill can respond quickly to emergency repair jobs.
380 kip precast bridge sections. One of the heaviest set in TN
20' Diameter x 33' deep Sanitary Sewer Drop Structure 15 Total Photos
Bridges for Trolley Extension in Downtown Memphis
If you have further questions about these projects, contact us. Phone: 901-767-6312 Fax: 901-767-1323 Email: ChrisHill@chillconstruction.com